
Instrument Tubing Contractor in Saudi Arabia
Instrument tubing is the core of our E&I experience. We install stainless steel tubing and impulse lines for transmitters, analyzers and control valves, from the first supports to the final hook up and pressure test.
First, second and third fix
We can take all three stages or step in at any stage of the installation.
First fix
Supports and routing
- Tube tray and support installation
- Instrument stands and mounting brackets
- Routing as per the approved hook up drawings
Second fix
Tubing and fittings
- Cutting, deburring and bending to the correct radius
- Twin ferrule compression fitting installation
- Manifold, valve and fitting installation
- Single tube and bundled tubing runs
Third fix
Hook up and testing
- Final hook up to instruments and process tapping points
- Hydrostatic or pneumatic pressure test to the approved procedure
- Leak testing, flushing and blowing through
- Tagging, punch clearance and test records signed by the client
Materials
Free issue or supplied by NiSS
- SS316 and SS316L seamless tubing in imperial and metric sizes
- Fittings, valves and manifolds from client approved manufacturers
- Tube supports, clamps and trays to project specification
Tubing that passes the first test
Leaks on instrument tubing usually come from poor fitting make up, wrong bend radius or dirt left in the line. Our fitters check every fitting with gap inspection gauges, use proper benders for every size, and keep tubing capped until it is connected.
Each line is pressure tested to the approved procedure, and the test is witnessed and signed off by the client before handover.

Common questions
Do you supply the tubing and fittings?
We can work with free issue material from the client, or supply tubing, fittings, valves and supports from manufacturers approved by the client.
Can you work on running plants and shutdowns?
Yes. We work under the client's permit to work system during normal operation and during planned shutdowns.
Can you supply tubing fitters only?
Yes. We supply qualified tubing fitters and supervisors on a manpower basis, or take the tubing scope as a subcontract.
Other services you may need
Request a quotation
Send us the scope of work, drawings or BOQ and our sales team will get back to you with a quotation.
